All new control philosophy for Linde Gas Botlek tank park

It all started with the installation of two new nitrogen compressors and culminated inan entirely new control philosophy for the Linde Gas Botlek tank park. CoNet played a very important role in the transformation towards a reliable back-up installation for the pipeline clients. CoNet made sure that the maintenance aspect was expressly included in the…
Read more

Dutch Cocoa upgrades PCS 7 to version V8.0 SP1

At some point the die has to be cast and the decision to implement a major upgrade is made. This was the case at Dutch Cocoa. In order to prevent incompatibility and further guarantee operational reliability, it was decided to upgrade the current PCS 7 system. Version v6.1 had to be replaced by v8.0 SP1.…
Read more

DuPont – upgrades PCS 7 to v7.1SP3

Process software can become obsolete or newer software versions are released.  Usually, upgrading the process control system has many advantages; increased functionality and better integration with other process components. However, a risk also exists; a badly implemented conversion or upgrade can jeopardise the production process’ continuity, resulting in something that should always be avoided…production down-time!…
Read more

Alkmaarse waste powerplant upgrade PCS8

"Increase (web)security, upgrade soft and hardware to the latest versions and improve engineering efficiency overall", that was, in a nutshell, what HVC commissioned CoNet to do.HVC is an energy and waste utility company of which 48 municipalities and 6 water authorities are the shareholders. To make a significant contribution to the climate goals that these…
Read more

Migration for two large nitrogen compressors of Lindegas

Lindegas and CoNet teamed up to pull off the software migration for two large nitrogen compressors in the Lindegas-plant in IJmuiden. Everything was nicely done within the set time limit and budget, in conformity with the CSIA-protocol. “That is exactly how a project should be carried out”, according to the principal.Raw material for the Lindegas-plant…
Read more

Scope: migrate 3 different systems to PCS 7

A clear assignment makes for an attractive project. Gebr. van der Lee / Tank Terminal Dordrecht were very clear indeed: "Migrate the existing ABB / Omron / Priva systems to Siemens PCS 7 and make sure that the terminal stays in service without any failures or downtime". Gebr. van der Lee offers a storage service…
Read more

Cargill upgrades Aurora 1 to PCS 7

A factory maintenance stop is should be as short as possible, whilst still using the downtime to overhaul and update as much systems and functionality as possible. In a way, a stop is the best moment and ultimate opportunity to get a increasingly outdated process section to meet the latest standards and functionality. Cargill had…
Read more