Customize Consent Preferences

We use cookies to help you navigate efficiently and perform certain functions. You will find detailed information about all cookies under each consent category below.

The cookies that are categorized as "Necessary" are stored on your browser as they are essential for enabling the basic functionalities of the site. ... 

Always Active

Necessary cookies are required to enable the basic features of this site, such as providing secure log-in or adjusting your consent preferences. These cookies do not store any personally identifiable data.

Functional cookies help perform certain functionalities like sharing the content of the website on social media platforms, collecting feedback, and other third-party features.

Analytical cookies are used to understand how visitors interact with the website. These cookies help provide information on metrics such as the number of visitors, bounce rate, traffic source, etc.

Performance cookies are used to understand and analyze the key performance indexes of the website which helps in delivering a better user experience for the visitors.

No cookies to display.

Advertisement cookies are used to provide visitors with customized advertisements based on the pages you visited previously and to analyze the effectiveness of the ad campaigns.

The Rotterdam transport company RET is becoming increasingly green. At the end of 2019, RET introduced 55 fully electric city buses. CoNet programmed and tested the Siemens 8DJH medium-voltage switchgear with SIPROTEC 5 Compact protections for the charging stations and subsequently put them into operation.

By 2030 all RET buses will be emission-free, saving a lot of diesel and thousands of tons of CO2 every year. These new electric buses drive specific routes around Rotterdam, Schiedam and Vlaardingen. The routes are specific as the electric busses must recharge at charging stations at along the route.

Programming and testing of the medium-voltage switchgears and circa 20 SIPROTEC 5 Compact transformer protections was carried out by CoNet for around 80 charging points at six different locations. Programming / settings are done with DIGSI 4. These SIPROTECS were eventually tested and the trip curves checked with Omicron test equipment.

8DJH medium voltage switchgear

CoNet is the first Siemens Solution Partner for Digital Grid technology to be familiar with this technology. “Our client had purchased Siemens 8DJH medium voltage installations of 10 kV and 20 kV to distribute the medium voltage towards the transformers,” According Jeroen Weemhoff of CoNet. “We have programmed, tested and commissioned these switches and the SIPROTEC 5 protections. A great assignment that had a lead time of approximately two months.”

Modbus communication with SCADA

This was the first time that CoNet needed to interface the SIPROTEC 5 Compact to a SCADA system via Modbus. Voltages, currents and trips are passed to the PLC which is linked to the overall SCADA system. With this SCADA system an operator can control and monitor all the remote locations. The charging stations are located at places where the buses must stop for a little longer, including Rotterdam Central Station and the RET depot. At each location there are also a couple fast chargers for the buses which stop for a shorter amount of time.

Siprotec Compact