A passion for offshore wind platforms

A passion for offshore wind platforms

Working on and with offshore wind platforms requires specific knowledge and experience. The circumstances are very different from those on land, therefore a different set of regulations applies. “It is an exciting and challenging environment to be working in”,...

read more
CoNet consultancy assignment in Belgium

CoNet consultancy assignment in Belgium

CoNet consultancy assignment in Belgium The Belgian joint venture JVW ( Joint Venture Wink Else) was rewarded the project to establish a new gas compression station. The control of the compresion station would be based upon Siematic PCS 7 systems .  CoNet was...

read more
Alkmaarse waste powerplant upgrade PCS7

Alkmaarse waste powerplant upgrade PCS7

"Increase (web)security, upgrade soft and hardware to the latest versions and improve engineering efficiency overall", that was, in a nutshell, what HVC commissioned CoNet to do. HVC is an energy and waste utility company of which 48 municipalities and 6 water...

read more
Allseas – crane control under the microscope

Allseas – crane control under the microscope

A ship with a length of 382m, built by Daewoo in South Korea and "final outfitting" in January 2015 in Rotterdam arrived and operational from mid-2016. CoNet was asked to take up the crane and lift control. There was the e.e.a. wrong with the crane control. In...

read more