A passion for offshore wind platforms

A passion for offshore wind platforms

Working on and with offshore wind platforms requires specific knowledge and experience. Moreover, the circumstances are very different from those on land; therefore, different regulations apply. “It is an exciting and challenging environment to be working in,”...

Allseas – crane control under the microscope

Allseas – crane control under the microscope

The Arrival and Operational Challenges of a 382m-long Ship In January 2015, a massive 382-meter-long ship built by Daewoo in South Korea arrived in Rotterdam, Netherlands, for its final outfitting. However, operational challenges arose when the ship's crane control...