Process software can become obsolete or newer software versions are released. Usually, upgrading the process control system has many advantages; increased functionality and better integration with other process components. However, a risk also exists; a badly...
Migration for two large nitrogen compressors of Lindegas
Lindegas and CoNet teamed up to pull off the software migration for two large nitrogen compressors in the Lindegas-plant in IJmuiden. Everything was nicely done within the set time limit and budget, in conformity with the CSIA-protocol. “That is exactly how a project...
Scope: migrate 3 different systems to PCS 7
A clear assignment makes for an attractive project. Gebr. van der Lee / Tank Terminal Dordrecht were very clear indeed: "Migrate the existing ABB / Omron / Priva systems to Siemens PCS 7 and make sure that the terminal stays in service without any failures or...
Dutch Cocoa upgrades PCS 7 to version V8.0 SP1
At some point the die has to be cast and the decision to implement a major upgrade is made. This was the case at Dutch Cocoa. In order to prevent incompatibility and further guarantee operational reliability, it was decided to upgrade the current PCS 7 system. Version...
DuPont – upgrades PCS 7 to v7.1SP3
Process software can become obsolete or newer software versions are released. Usually, upgrading the process control system has many advantages; increased functionality and better integration with other process components. However, a risk also exists; a badly...
Scope: migrate 3 different systems to PCS 7
A clear assignment makes for an attractive project. Gebr. van der Lee / Tank Terminal Dordrecht were very clear indeed: "Migrate the existing ABB / Omron / Priva systems to Siemens PCS 7 and make sure that the terminal stays in service without any failures or...
Migration for two large nitrogen compressors of Lindegas
Lindegas and CoNet teamed up to pull off the software migration for two large nitrogen compressors in the Lindegas-plant in IJmuiden. Everything was nicely done within the set time limit and budget, in conformity with the CSIA-protocol. “That is exactly how a project...
Dutch Cocoa upgrades PCS 7 to version V8.0 SP1
At some point the die has to be cast and the decision to implement a major upgrade is made. This was the case at Dutch Cocoa. In order to prevent incompatibility and further guarantee operational reliability, it was decided to upgrade the current PCS 7 system. Version...
Cargill upgrades Aurora 1 to PCS 7
A factory maintenance stop is should be as short as possible, whilst still using the downtime to overhaul and update as much systems and functionality as possible. In a way, a stop is the best moment and ultimate opportunity to get a increasingly outdated process...
Cargill upgrades Aurora 1 to PCS 7
A factory maintenance stop is should be as short as possible, whilst still using the downtime to overhaul and update as much systems and functionality as possible. In a way, a stop is the best moment and ultimate opportunity to get a increasingly outdated process...